We review the work done yesterday and scheduled for today from the department of services. ROADS AND ROADS -Place number on Calle Presbítero Rodríguez Cabrera. -Arrangement in Zahorra of the road behind the cemetery -Arrangement of road grading in La Calzona -Arrangement in road grading in La Huerta SEVERAL -Place a sign forbidden to park in the area of ??the main entrance of the Holy. -Start with the distribution of the rally signage. -Repair lighting and check air conditioning in Social Services. -Review automatic tables in the Center for the Elderly. -Repair lighting in the bar area of ??the Senior Center. -Clean air conditioning filter from the Tourist Office. -Repair phone in Treasury. -Repair plugs in La Cárcel Cultural Center. -Comenzar con la colocación de carteles en marquesinas para la campaña de reciclaje. JARDINERÍA -Comenzar con la obra de arranque y colocación de los cipreses de la entrada del cementerio. -Recorte de arbustos en la zona de la Santa. COLEGIOS -Instalar ventilador que se ha caído en CEIP Guadalentín. -Tapar agujeros en el colegio de Santiago. -Arreglo de arenero en el colegio de Lebor.